Sunday, May 20, 2012

Leeds Solar | solar energy installers | PV panels

Introducing Leeds Solar | The Solar Specialists

12-x-sanyo-h-series-250wp-black-framed-panels-3kwp-ilkley-2Leeds Solar are specialist MCS certified designers and installers of solar energy systems, including Solar PV panels (electricity) and Solar Water Heating for domestic, commercial and industrial buildings.

We are a highly experienced, Leeds based company covering West Yorkshire and the surrounding area, with accreditation from MCS, REAL, NAPIT, Panasonic Solar Premium Installers scheme, and the Guild of Master Craftsmen.

Read more: Introducing Leeds Solar | The Solar Specialists

 

EPC information

epc

Around 80% of all domestic properties are capable of meeting the new Energy Performance Certificate (EPC) band D requirements for claiming the higher FIT rates, once a solar PV system is installed together with a few low cost energy efficiency measures.

Leeds Solar produce an EPC as standard during our solar PV quote process, and if necessary will produce an additional package of low cost energy efficiency measures to bring your building up to the band D EPC rating.

Read more: EPC information

Commercial / Industrial Solar

9.75 kwp system schott panels headingleyLeeds Solar are experienced installers of 3 phase solar PV installations on non-domestic properties including commercial, industrial, farms, cafes, churches, community centres.

We can install up to 10kW systems with out needing advance permission, and help secure permission for up to 50KWp installations.

Read more: Commercial / Industrial Solar

  • EPC arrangements and 30th June FIT cuts

    30th June 2012 is the next proposed date for further Feed In Tariff cuts; Book now for pre 30th June installations The government has proposed a further cut to the Feed In Tariff rates for solar P ...

    Read more
    by Leeds Solar
    Thursday, 03 May 2012
    0 votes
  • July FIT cuts - analysis of the March-April solar PV figures

    *03/05/12 update* It looks like we misinterpreted th figures, and DECC proposed to reference only the installation figures from 4th March-end of April 2012 to determine the FIT cuts, so the installat ...

    Read more
    by Leeds Solar
    Wednesday, 02 May 2012
    0 votes
View more featured blog entries
solar PV | solar panels | solar energy | solar power | solar installers | Feed In Tariff | renewable energy | solar water heating | energy efficiency | EPC
Solar Panels Leeds | Adel | Armley | Chapel Allerton | Cookridge | Crossgates | Guiseley | Headingley | Holt Park | Horsforth | Hyde Park | Meanwood | Menston | Otley | Rawdon | Thorner | West Park
West Yorkshire | Bingley | Bradford | Brighouse | Castleford | Ilkley | Pontefract | Wakefield | Wetherby | North Yorkshire | Beverley | Harrogate | Knaresborough | Northallerton | York | South Yorkshire & Derbyshire | Barnsley | Chesterfield | Sheffield