EPC arrangements and 30th June FIT cuts Featured

30th June 2012 is the next proposed date for further Feed In Tariff cuts;
Book now for pre 30th June installations
The government has proposed a further cut to the Feed In Tariff rates for solar PV from 30th June 2012, with the level of this cut being dependant upon the volume of installations that were registered in March and April.
Our analysis of these installation figures shows that it's likely that these cuts will mean the current 21p/kWh FIT rate for below 4kW solar PV installations could fall to 16.5p/kWh with similar cuts for larger installations.
...
*03/05/12 update*
Leeds Solar summarise the decisions DECC announced today resulting from the Feed In Tariff consultation started in October 2011.
We currently have 100KWp of PV scheduled for installation in February and all our February installation slots are now filled.




