St. Chads Parish Centre

| Capacity | 3.92 kWp |
| Predicted Output | 3,290 kWh |
| Panel Type | Hyundai 245Wp |
| Inverter | Aurora Power-One |
| Roof Type | Concrete Tile |
| Location | Headingley, Leeds |
Installed in May 2012 the all black panels were chosen due to the roof#s prominant location on the drive up to the grade 1 listed St Chads Church.


